Implementation

The decree locks the instruments that drive the case.

Tariff, royalty, currency path, land release and the first 500 km class.

Seven pillars

01

Staged construction

Pipe classes advance from 500 km to 18,000 km. Local capacity is built at each hold point.

02

Lake Nasser, then the sea

Lake Nasser is the main supply through year 24. From year 25, seawater desalination is used extensively.

03

The old valley

By year 13 the old Nile valley irrigation schedule is changed completely to a modern system.

04

Water tariff

The volumetric charge is the company’s core income and a national instrument of the decree.

05

Currency path

Hard-currency income through Year 15. From Year 16, the equivalent amount in pounds.

06

Lease occupancy

Prepared plots are released in phases to youth co-operatives and qualified farms.

07

Crop mix

Wheat, maize, cotton, sugar beet and soybean diversify royalty income and national supply.

InstrumentsEffectStatus
Volumetric water tariffCore company incomeTo be decreed
8% royalty and land leaseSecond income streamConfirmed
Hard-currency charges to Year 15Funds the capital rampConfirmed
Phased land releaseMatches the pipe classesStaged
Five-crop platformFood security plus royaltyConfirmed
Staged $51.1bn capitalFollows the four pipe classesProgrammed

Six steps from decree to delivery

  1. 01

    Finalise land and Lake Nasser rights with the state and the Sovereign Fund, and seawater rights for the year-25 phase.

  2. 02

    Complete detailed design and Phase 1 financing for the first 500 km and land preparation.

  3. 03

    Stand up the project company and a standard lease plus water-charge contract.

  4. 04

    Launch first leases to youth co-operatives and qualified farm companies.

  5. 05

    Expand lines and leasable area. Raise local manufacturing content at each class.

  6. 06

    Monitor leases, delivered cubic metres and national production.

Invited to join the corporation

The decree forms the water company that executes Phase 1, beside the Egyptian Mega Agriculture Corporation, and invites these partners to join it.

  • Europe

    Engineering, technology and industrial execution.

  • China

    Equipment, technology and industrial execution.

  • International and GCC investors

    International investors, and investors from the Gulf Cooperation Council, taking equity in the corporation.

  • Banks and institutions

    Major Egyptian and international banks and institutions, for debt, guarantees and long finance.

Recommendation

Issue the Presidential Decree. Instruct Phase 1.

  1. 1

    Adopt the Charts series as the official path: €28.1 billion accumulated cash by Year 50.

  2. 2

    Set the volumetric tariff, the 8% royalty and the land-lease framework in the decree.

  3. 3

    Assign land and Lake Nasser rights through year 25, and seawater rights from the year desalination is used extensively.

  4. 4

    Authorise Phase 1: first 500 km class, land preparation, and the manufacturing cluster.

  5. 5

    Direct a national financing plan: equity, staged debt, sovereign support and localisation.

  6. 6

    Standardise lease contracts and open the first plots to co-operatives and farm companies.

  7. 7

    Instruct annual reporting on cubic metres, the year-13 valley conversion, leases and national production.

Feasibility study G · September 2026. Planning figures. Validate before capital commitment.