Proposed sites

Five plants, from Menya to Safaga.

The industrial portfolio sets out five sites, not one factory. Menya builds passenger cars and SUVs. Bani Sweif builds pickups and light commercial vehicles. Asyut builds trucks and buses. Aswan makes the tyres and the components. Safaga, on the port, is the battery gigafactory. Together they take 8.0 million square metres. The drawings are the phase masterplans in the portfolio. They are not a granted site.

The plants

5

Area

8.0 million m²

Span

Menya — Safaga

01

Menya

Passenger car and SUV plant

  • Four assembly lines: SUV, sedan, hybrid and electric
  • A two-kilometre test track
  • A 15 MW solar canopy
  • Monument plaza and a visitor centre
Role
National launch hub and HyperHybrid flagship
Production
Passenger cars, SUVs and hybrid drivetrains
Area
1.6 million m²
Passenger car and SUV plant

Phase masterplan from the portfolio. The labels on the drawing are in English. The statement above is the text of the site.

02

Bani Sweif

Pickup and light commercial plant

  • Two assembly lines, for pickups and light commercial vehicles
  • A battery-module dock and a tyre interface
  • A 10 MW solar canopy
  • A logistics yard, linked to Menya, Cairo and Asyut
Role
Utility and commercial assembly hub
Production
Pickups, light commercial vehicles and fleet electrification
Area
1.4 million m²
Pickup and light commercial plant

Phase masterplan from the portfolio. The labels on the drawing are in English. The statement above is the text of the site.

03

Asyut

Heavy vehicle complex

  • Traction lines at 400 V and 800 V
  • Chassis yard, and motor and inverter assembly
  • Battery-pack mounting and a heavy-duty test track
  • A 10 MW solar canopy and an export yard on the national corridor
Role
National heavy-duty electrification centre
Production
Trucks, buses and high-voltage traction
Area
2.0 million m²
Heavy vehicle complex

Phase masterplan from the portfolio. The labels on the drawing are in English. The statement above is the text of the site.

04

Aswan

Tyre factory and component cluster

  • Four hundred curing presses, for passenger and truck tyres
  • Mixing, extrusion and a curing hall
  • A retreading unit
  • A 20 MW solar farm, linked to the Asyut complex
Role
National tyre and rubber ecosystem
Production
Passenger and truck tyres, retreading and rubber components
Area
1.2 million m²
Tyre factory and component cluster

Phase masterplan from the portfolio. The labels on the drawing are in English. The statement above is the text of the site.

05

Safaga

Battery gigafactory

  • A cell hall and a blade assembly hall
  • Module packaging at 48 V, 72 V, 400 V and 800 V
  • Recycling and material recovery
  • A 25 MW solar roof and a wind micro-farm, with a corridor to Safaga port
Role
National energy storage and battery hub
Production
Blade cells, modules, recycling and material recovery
Area
1.8 million m²
Battery gigafactory

Phase masterplan from the portfolio. The labels on the drawing are in English. The statement above is the text of the site.