Presidential decree pack · September 2026

Sun in. Fuels and green iron out.

An Egyptian desert cluster for energy independence, with surplus renewable fuel to Europe. Fifty years, 2027–2076. The decree adopts bankable FEED.

Highly favourable. The decree authorizes FEED.

The decreeReady for decree

Programme cover. Atmosphere, not a plant photograph.

P&L capital

€184.7bn

50-year sales

€2.38tn

Revenue / capital

12.9×

Study judgement

9 / 10

weighted 7 · adopted for the decree

Breakeven / payback

~3.9 yrs

Year 4 · simple revenue payback

One cluster

What leaves the gate

The products that leave the gate. Power, methanol, jet fuel and iron use the pack. Hydrogen follows the iron ramp up to the stated 16.2 Mt peak. Naphtha is 85 Mt over fifty years, with no yearly line.

Year

2034

202720522076

Power

371 GW

Hydrogen

7.0 Mt

e-Methanol

22.5 Mt

SAF

4.1 Mt

DRI steel

72.2 Mt

Naphtha

85.0 Mt · 50 yr

Study card

Weighted total 7. Strategic fit and the national effect are excellent. Returns are strong, the funding path is clear, and the 17-year ramp is managed in phases. Volumes are set in sale contracts.

Strategic fit

9

Independence plus Europe export

Market / offtake

7

Volumes set by sale contracts

Technical

7

Integrated, from source to product

Financial

6

Strong returns and a clear funding path

Execution

5

The 17-year ramp is managed in phases

Rules / currency

6

64 → 30 pounds is an assumption

Environment / nation

9

Jobs, fuel, and an industrial base

Weighted total

7

Adopted — FEED is the decree step

Construction jobs

75,000

Operating jobs

45,000

Start

2027

Full power

2043

Horizon

2076

Core plants

Patterned-glass furnace and float-glass line€250 / 288m
PV module assembly and polysilicon plant€238 / 516m
Water electrolysis plant€9.17bn
Methanol synthesis plant€14.94bn
Hydrogen shaft furnace and iron-ore mine€2.06bn
Methanol-to-jet plant€0.84bn
HVDC cable plant and converter stations€5.50bn

Feasibility Study G and the P&L. September 2026. Planning figures. Payback is simple revenue payback, not a discounted cash flow. The 64→30 pound path is a model assumption, not a forecast.